JETA's Environmental Policy

 

Jeta Corporation will remain a true champion for the environment incorporating best practices supporting legal requirements relating to the environment impacted by our operations and products currently represented throughout our industry. Jeta Corporation will continually research technological advancements identifying continual improvements that will help decrease overall pollution, such as harmful emissions or disposal of materials incorporating systems and or processes.

 

JETA Corporation tracks the following impacts:

Greenhouse Gases – as of March 2017

Type of Energy Location Measurement CO2 Equivalent in Metric Tons*
Gasoline Neenah 350.81 gallons 3.1
Gasoline Nipomo 370.26 gallons 3.3
Therms Neenah 1,598.00 therms 8.5
Kilowatt hours Neenah 7,640.00 kilo hours 5.4
Kilowatt hours Nipomo 521.00 kilo hours 0.366
 

Waste – as of March 2017

Type of Energy Location Measurement
Waste Neenah 1,560 lbs (approx.)**
Waste Nipomo 864 lbs (approx.)**
 

*CO2 equivalent found using http://www.epa.gov/cleanenergy/energy-resources/calculator.html

**Waste based on an average of 3.0 lbs. per person per day

 

Water Use – as of March 2017

Date Range Location Reading Usage (hundreds)
Dec 2016 - Feb 2017 Neenah 1,424 59
Dec 2016 - Feb 2017 Nipomo approx.* 30
March 2017 - May 2017 Neenah NA NA
March 2017 - May 2017 Nipomo approx.* NA
June 2017 - August 2017 Neenah NA NA
June 2017 - August 2017 Nipomo approx.* NA
Sept 2017 - Nov 2017 Neenah NA NA
Sept 2017 - Nov 2017 Nipomo approx.* NA
 

*Jeta is not billed for water at the rented Nipomo facility, so the estimate is half the usage of Neenah.

 

JETA - Environmental Projects

Year Project Details
2008 Warehouse Lighting Project Removed all 500 watt mercury vapor lighting to 4 fixture T8 with motion and thermal sensors
2010 Recycling Program Provided waste container for trash and recyclables at each work station
2012 Office expansion 2,000 sq ft and Remodel of Existing Space Insulation Improvement
2012 Furnace and Air Conditioner Replacements (Carrier Systems – Energy Efficient) to balance air flow throughout the offices
2012 Upgrade to low flush toilets in all bathrooms
2013 Warehouse & Parking Lot Replace all gas-forced air heating systems in the warehouse and truck garage with infrared heat
2013 Phase 1 - parking lot upgrade: change out 1/3 from asphalt surface to concrete. This project is a part of a 3-year upgrade to eliminate the oil-base product that needs upgrades and constant repair to a long-term solution that we believe to be environmentally friendly while also reflecting heat away from our facility in a similar fashion as the light-colored roof on our office and warehouse. Phase 2 & 3 scheduled for 2015 & 2016
2013 All external security lighting was replaced with LED Technology
2014 Exterior Building Office Area All window and EIFS were caulked and sealed to eliminate cold air flow and water damage
2015 Recycling Program / Waste Reduction Updated all accounts to submit paperwork electronically whenever possible
2015 Gasoline Reduction Initiative Purchased Box Truck to reduce the number of delivery trips made by our Wisconsin warehouse
2017 Warehouse Lighting Project Update Wisconsin warehouse lighting to LED